Some Projects

A school building that prioritises wellbeing and sustainability to provide an inspirational learning environment.

Wintringham Primary Academy

D RMM Wintringham Academy Hufton Crow 001
WINGTRINGHAM ACADEMY 20191210 120848699 HDR 2
D RMM Wintringham Academy Hufton Crow 015
D RMM Wintringham Academy Hufton Crow 026crop

An award winning and pioneering school with a design which prioritises natural light, ventilation and its cross laminated timber structure.

WINTRINGHAM ACADEMY FE Model 2 2

Architect: dRMM

For: Cambridgeshire County Council & Diamond Learning Partnership

Wintringham Primary Academy - a three-form entry primary school for up to 708 children, is a prominent building on the public square and a natural focal point, which now plays an important role in establishing the Wintringham Park community.

The design is organised as a school in the round with two stacked levels of classrooms arranged around a landscaped courtyard, known as ‘the grove’. Our close working relationship with dRMM and KLH allowed for collaborative innovation, which was key to realising the ambitious scheme, and resulted in an efficient and well-coordinated design that kept costs to a minimum.

The school was completed in 2020 after a construction programme of just 14 months during the pandemic. As structural engineers for the superstructure, we created a cross laminated timber (CLT) frame – which delivers low carbon credentials and given recent research results, is likely to create a more nurturing environment conducive to learning.

Forming the roof in CLT allowed for a thinner overhang compared to steel and avoided complex temporary works required for concrete. Due to the overhang varying in length, and the support line following the curved form of the building, complex finite element (FE) analysis was required to determine the actual deflections of the CLT roof panels and ensure they remained within the required limits.

The sports hall’s east elevation required a continuous glazed strip just under roof level to provide natural light to the hall. Responding to this design requirement from dRMM, we worked with KLH to develop a prefabricated glulam beam and tapering stub column section where the stub column was fixed to the beam via a 90o finger joint. This eliminated the need for the column to continue to the foundations – it could instead gently rest on the head of the CLT wall under the glazing strip due to the moment capacity of the finger joint.

Since its completion, Wintringham Primary Academy has been awarded the RIBA East Regional Award, and the RIBA East Sustainability Prize, and has been Highly Commended for the Structural Timber Awards - Project of the Year.

Imagery: Hufton+Crow, Engenuiti


Related Projects

00520 Grange School 1

The Grange Primary School, Southwark, London

An extension to an existing primary school to increase intake from 1.5 to 2FE. The new build CLT structure creates a new …

00480 Stratton Upper School Complete 1

Stratton Upper School, Biggleswade, Bedfordshire

A two-storey extension housing a new science block linked back to the main school building, allowing for the expansion o …

00797 Global Complete 1

Global Academy, Hayes, London

A new modular built 800 place academy for 14 to 19 year olds, focussed on media and entrepreneurship. …